Sand washing machine configuration selection skills

Sand washing machine configuration
How many reasonable equipment should a complete sand washing production line be equipped with? There are two basic requirements for configuring a sand washing machine:

1. According to the production demand of the sand washing field. For example, when the output of the sand washing field is 600 tons per hour, the output is relatively large. In this case, it is of course not enough to configure one sand washing machine. To complete the sand washing work, at least two sand washing machines should be equipped.

The second is the need for sand cleanliness. If the cleanliness requirement is relatively high, two or more sand washing machines need to be equipped.

Sand washing plant configuration

The sand washing machine is the main machine in the sand washing field. The distribution of the above two situations is only a rough estimate. After all, the processing capacity of each sand washing machine is different. As for the configuration of the sand washing machine, it depends on your actual production. Depending on the situation, Longzhong Heavy Industry has focused on the research and development of sand washing and sand making sludge treatment equipment for many years, and can help you design a solution that is more suitable for you according to your actual situation and requirements.

For example, the production requirement is 100 tons per hour. There are three design schemes: one is to configure a spiral sand washing machine, the other is to configure a three-in-one sand washing machine, and the third is to configure two impeller sand washing machines.